Quality inspection of steel tank water tank
A. Water tank board before the production of test materials, specifications, etc., to ensure that meet the requirements.
B. Water tank board production and installation process in strict accordance with the procedures for the production, promptly remove the defect plate.
C. Installation completed inspection, the welding site to test whether the weld Full, whether there are slag and other defects, the failure of the weld in time to ensure that the use of the pad to meet the requirements, whether the pressure, the pressure on the pad is not a good time to correct.
D. Weld kerosene test: Timely fill welding.
E. full water test: weld 24 hours infiltration is not leaked as qualified, 72 hours of infiltration of the pad does not leak for the qualified.
F leakage parts repair: the weld part of the water leakage to determine the site should be carried out Welding parts; should be tightened, such as fastening is still leaking parts, should increase the pad or raw material; water tank plate itself leaks, can not be restored to qualified should be replaced.
For more information, please visit our website: www.grp-watertank.com, or contact us with E-mail, our E-mail address is rask@coolingtowerfiller.com, you can also chat us straightly on whatsapp: 008618330029204
B. Water tank board production and installation process in strict accordance with the procedures for the production, promptly remove the defect plate.
C. Installation completed inspection, the welding site to test whether the weld Full, whether there are slag and other defects, the failure of the weld in time to ensure that the use of the pad to meet the requirements, whether the pressure, the pressure on the pad is not a good time to correct.
D. Weld kerosene test: Timely fill welding.
E. full water test: weld 24 hours infiltration is not leaked as qualified, 72 hours of infiltration of the pad does not leak for the qualified.
F leakage parts repair: the weld part of the water leakage to determine the site should be carried out Welding parts; should be tightened, such as fastening is still leaking parts, should increase the pad or raw material; water tank plate itself leaks, can not be restored to qualified should be replaced.