Several safety measures should be paid attention to when installing glass fiber reinforced plastic tank

FRP water tank installation and construction should pay attention to a few security measures:
1 construction organization design must be clear safety and technical measures, or not construction.
2 construction site should have drains, stacking materials to consider the fire truck to enter.
3 construction site all holes, aisle, entrances and exits should be set to effective protection.
4 into the construction site must wear helmets, prohibit wearing slippers or barefoot, in the absence of protective facilities at high altitude construction must wear seat belts, is strictly prohibited post-drink operation.
5 to strengthen the electricity, gas welding operations, oxygen, acetylene and other flammable, explosive management, oxygen bottles and acetylene bottles should be greater than the distance of 10 meters, the timely removal of solder joints around the flammable materials, , Prepared fire equipment, to prevent the occurrence of fire accidents.
6 use electrical welding when there is an operating permit, and clean up the surrounding flammable and explosive materials, equipped with fire equipment, and set someone to see the fire.
7 on the line to prohibit the load connected to power, and prohibit live operation.
8 melting solder, tin block, tools to dry, to prevent splashing.
9 ladder used for aerial work should always check whether the solid, ladder, the slope of not more than 50-70 degrees, the top of the ladder should be fixed on the building, the foot should be set anti-slip section, or below should have escalators.
10 in the ladder or scaffolding pipe clamps on the installation of pipes and parts, the need to hold the tube in one hand, one hand grip handle operation, not both hands clamp handle, to prevent slippage from danger.
Fire protection measures
1. To implement the "to prevent the main, anti-consumer combination," the fire policy, combined with the construction of the actual situation, strengthen leadership, organize the implementation of the establishment of fire responsibility system. The establishment of fire, security system to ensure the safety of construction. Make the construction site on-site management, the storage of flammable materials to set up a management person responsible for custody, away from fire.
2. The establishment of fire safety leading group, by the project manager as the head of the safety and responsibility of engineers as members of the team, equipped with fire equipment, facilities, regular checks and found hidden hazards timely processing, on-site construction operations, equipment, materials, Blocking the fire.
3. The construction of the electrical installation, maintenance, are responsible for the formal electrician. It is strictly prohibited to pull the lighting line, point electric furnace, to avoid electrical accidents caused by fire.
4. Strict implementation of the scene with the fire system, electricity, steam welding with fire before the need to apply for fire permits, and set up to see fire, with fire equipment.
5. Construction of fire pipes, facilities and other projects in conflict with the construction staff shall not be allowed to handle changes, should promptly consult the higher authorities and design units, after approval can be changed.
6. Warehouse, the implementation of 24-hour on-site fire duty system, equipped with adequate fire equipment are not allowed to set the stove, are not allowed to smoke, are not allowed to light and candles, are not allowed to pull any wire, not allowed unrelated personnel storage.
7. Construction personnel strictly enforce the on-site fire protection system and the relevant provisions of the higher authorities.
If you want to know more, please send E-mail to Hebei LongTime Water tank Company, the E-mail address is: rask@coolingtowerfiller.com, you can also send message to whatsapp: 008618330029204